Note: This product is no longer available. Please see our other 0.1uF capacitors.
Capacitance: 0.1 uF
Tolerance: 20%
Terminals: Long (35mm) Radial Leaded (Through Hole)
Dielectric Characteristic: Y5V
Lead Spacing (Pitch): 5.08mm (0.20")
Operating Temperature: -30°C to +85°C
Packaging: Individual
0.1uf / 50v Multilayer Ceramic Capacitor (Long Lead)
- Product Code: cap mult cerm 0.1uf 50v-4
- Availability: Discontinued - Not Available
-
$0.09 USD
-
- 10 or more $0.08 USD
- 100 or more $0.06 USD
Related Products
Tags: capacitor, 0.1uf, 50v, multilayer, ceramic, (long, lead), capacitors, non-electrolytic capacitors:, cerm, 50v-4 monolithic